Weeks 10 – 12 Wheel team (Grace & Ali pictured above) tuning spokes on the front wheel Wheel team”truing” the front wheel Wheel team threading the tire rubber onto the front wheel frame Wheel team assembling brake plates Bike frame with front wheel and rear fender Fork team (Izzy & Alex) assembling handle bar onto the frame Bike with both tires and handle bars Frame team (Catherine & Vidur) putting the finishing touches on the fuel tank Transmission assembled in bottom end of engine Top end team (Parker & Chris) assembling the pistons and top end of the engine Timing side of engine with complete bottom and top end assembly (not bolted up yet) Clutch side of engine with complete clutch and rotor assembly (not bolted up yet) Electrical team (Preston & Diego) assembling alternator and wires on clutch side of engine Close up view of the alternator (you can see the various transformers and solenoids that contribute to the electrical system) Engine completely assembled with main oil reservoir attached Group effort to bolt engine to bike frame Professor Littman pouring gasoline into the fuel tank Completed bike!